Pages

Wednesday, December 20, 2023

Wellhead Deficiencies

In this article, we continue our discussion of the Top 10 most frequently cited significant deficiencies and violations to raise awareness and help operators identify and correct issues before they become a potential health threat or citations in a sanitary survey. At #2 in the Top 10, source construction deficiencies (S030) were cited 9% of the time during sanitary surveys for the 2022 inspection year and 9% in the 2023 inspection year. Groundwater wells are the most common sources of drinking water used in Colorado (70% of public water systems use groundwater wells) and are perhaps one of the most overlooked parts of water systems. Wells can go unnoticed for years since they are often located away from most activities and may only be noticed when the flow of water is altered. The most commonly discovered significant deficiencies with wells are related to electrical conduits, gaskets, vents and vaults.

What are the minimum standards for a properly constructed well? In the “State of Colorado Design Criteria for Potable Water Systems” (Policy DW005), CDPHE actually primarily refers to the Colorado Division of Water Resources’ (DNR) latest edition of “2 CCR 402-2 Rules and Regulations for Water Well Construction, Pump Installation, Cistern Installation, and Monitoring and Observation Hole/Well Construction” (a.k.a. Colorado Well Driller Regulations). The purpose of these regulations is to ensure public health and the safety of groundwater resources. The regulation outlines minimum construction standards for all types of wells in all types of environments, and it defines minimum well height, screening, minimum distance from potential sources of contamination, grouting standards, pump installation and much more.

There are many variations to well heads, but the two primary ones that inspectors come across are the “split-cap” and the “well-cap” (see image below for reference). The “split-cap” has the discharge line, vent and electrical conduit all protruding from the wellhead. The well head is comprised of two metal plates with a rubber gasket in between. When installed, the two plates are compressed, the rubber gasket expands and creates a watertight seal. The “well-cap” has a pitless water connection (below frostline) and a designated female electrical connection, a set of gaskets and a built-in vent (which are typically screened).


*photo courtesy of Oregon State University https://wellwater.oregonstate.edu/well-water/wells/well-check-list

Well head

Well heads must be designed and constructed at the top of well casings to prevent the entry of contaminants into the well. The majority of the wells that the department inspects are located outdoors and are exposed to the elements. It is vital that the wells are constructed and maintained in a manner that will protect the raw water. Some common issues that inspectors observe are missing/damaged gaskets, missing bolts, broken or loose well caps (bolts are missing or not tightened), split-caps not seated on the well casing properly and a split-cap with a rope (used to hold the well pump in position or to assist in pulling the pump out) coming out of the well that is not properly sealed.

The split-cap well head was not properly sealed to the well casing. The supplier applied caulking between the split-cap and the well casing.

The bottom of the well head cap was broken and did not allow for a tight seal. A new well head was installed.

Well Vents

Vents are an integral part of a well as they permit air to freely enter and exit the well. Vents need to be located at a minimum of one foot above ground level, be turned down and be covered with a non-corrodible screen. Screens may not have openings that exceed 0.07 inches (typically 12 or 16 mesh screen). 

The two most common issues observed with vents on wells are that they are broken or missing.


The well-cap has a built-in vent that was broken/corroded. The supplier replaced the broken screen with an acceptable mesh screen.

Electrical Conduit

According to the Colorado Well Driller Regulation, electrical connections are to meet the standards of the NFPA 70: National Electric Code (2014). Some common electrical conduit issues that are observed during sanitary surveys are where the electrical conduit has separated from the well head or the junction box which can typically occur due to the ground settling. Another common finding is missing or partially attached cover plates on electrical junction boxes. Split-cap wells can also have electrical wires penetrating the well top without a properly constructed conduit or a proper seal between the wire and the rubber gasket. All of these situations present a pathway for contaminants to enter the well, which pose a health risk and are significant deficiencies that will be cited during a sanitary survey.


The electrical conduit separated from the electrical junction box, creating an opening. The supplier installed a conduit sleeve to provide a watertight junction.


The electrical junction box was missing a screw. The supplier sealed the hole with caulk.


Split-cap well had the electrical wire enter from an unsealed port. The supplier sealed the gap with caulk.

Well Vaults

Although well vaults are not a common practice these days, the department still observes wells located in vaults. Placing a well in a vault was a common practice to protect the well from the elements. However, having a well in a vault can subject the well to flooding. If a well is located in a vault, the vault cover or lid must be watertight and the vault must either drain to daylight or have a sump. Evidence of water accumulating in the vault and potentially submerging the wellhead is a significant deficiency.


Well vault was subject to flooding. Supplier installed a sump pump.

Concrete Pads

Inspectors are frequently asked if concrete pads are required? The Colorado Well Driller Regulation along with the department do not recommend that wells have concrete pads with the exception of hand-pumped wells. Well pads were commonly installed if well depths were less than 100 feet or to keep vegetation down around the well head. However, the department has observed that concrete pads tend to attract animals that burrow underneath the pad creating a source of contamination. Concrete pads also tend to crack and shift, which can create a funnel effect and divert surface water to the well casing. Minor cracks can be repaired; however, the department recommends that a supplier remove their existing concrete pad if they notice animals burrowing or if the concrete pad begins to divert surface water to the well casing. Evidence of burrows under a concrete pad or severely damaged pads capable of channeling surface water to the well casing are significant deficiencies that would be cited during a sanitary survey.


Burrow located under the concrete pad, the burrow was filled in and will be monitored in the future.

Drainage and Slope

According to the Colorado Well Driller Regulation, well locations should incorporate proper positive drainage from the well casing. As a rule of thumb, the department has historically viewed positive drainage 20 feet in all directions from the well if possible. Wells should not be located in depressions as surface water can pool around the well casing and be a source of contamination. If a well is built on a slope, a berm is recommended uphill to divert runoff and surface water away from the well casing. 


Well was located in a depression that could allow for water to pool around the well casing. The supplier added pea gravel around the well head and created positive drainage away from the well casing.

For more information the department recommends that suppliers utilize DNR’s latest edition of “2 CCR 402-2 Rules and Regulations for Water Well Construction, Pump Installation, Cistern Installation, and Monitoring and Observation Hole/Well Construction” for proper well construction, maintenances and fixes. In addition, suppliers may email the Field Services team at cdphe_wqcd_fss_questions@state.co.us if they have any questions or concerns.

➽ Tom Valenta, CWP, Field Services Work Group Leader

Wednesday, December 13, 2023

Cybersecurity: simple steps to protect your system

Cyberattacks on critical infrastructure in the US continue to be a major concern and present a potential disruption to the critical work that water and wastewater systems provide for their communities. On October 12, 2023 the US EPA withdrew their Cybersecurity Rule citing legal challenges. However, cybersecurity planning and preventing attacks continues to be a central focus of the federal government. EPA and CISA continue to provide technical support to water systems. Regardless of federal requirements, the division wants to emphasize the significant financial and operational risks that cyberattacks pose to systems. The division continues to partner with state and federal entities to provide cybersecurity planning tools, resources, training opportunities, and self-evaluations.

Who is vulnerable?

According to a recent Waterfall Security Report, in 2022 the critical infrastructure sector experienced a 140% surge in cyberattacks resulting in more than 150 incidents. The majority of these assaults were in the form of ransomware, encrypting critical computer systems and invaluable data across Informational Technology (IT) networks. However, the attacks impacted operational technology (OT) as well. Any system that uses OT and or IT is vulnerable to cyberattacks. These attacks can negatively affect treatment, distribution, collections, administrative support, and financial/billing systems. These effects can impact your ability to protect public health and the environment and often cost large sums of money. Here are some examples of OT and IT:

  • OT = Industrial Control System (ICS), Supervisory Control and Data Acquisition (SCADA), Programmable Logic Controllers (PLCs),Remote terminal units (RTUs), Internet of things (IoT) devices, Industrial internet of things (IIoT) devices, also known as Industry 4.0, building management systems, fire control systems, and physical access control mechanisms.
  • IT = Laptops, Desktops, Tablets, servers, computer hardware, software, electronics, semiconductors, internet, telecom equipment, and e-commerce.

What are some basic steps you can take to protect your system?

Regardless of the size of your system or the scope of your technology use. please take the following basic cybersecurity steps at your facility to help prevent cyberattacks: 

  1. Change passwords regularly (at least once every 3 months). 
  2. Use multi-factor authentication for access.
  3. Take away system access when staff leave the utility.
  4. Implement regular staff training on cybersecurity fundamentals (especially how to recognize phishing attempts).
  5. System maintenance
    • Do frequent back-ups
    • Keep up to date with software and install patches

According to EPA and CISA, taking these low-cost steps can prevent many cyberattacks.

In addition to the above basic preventive measures you and your system can explore the many available free cybersecurity tools and resources: 

Thank you for all that you and your system do to protect the public health and environment of Colorado’s communities! Please reach out to the division’s security contact kyra.gregory@state.co.us with any questions. 

➽ Heather Young Field Services Section Manager 

➽ Kyra Gregory Drinking Water Training Specialist 


Wednesday, December 6, 2023

Backflow Prevention and Cross Connection Control Regulation Updates


The updated Backflow Prevention and Cross Connection Control Program (BPCCC) rule (in Regulation 11 Section 11.39) was officially active as of October 15, 2023! The Division greatly appreciated all the stakeholder support in developing the updated BPCCC regulation and also the updated DW007 BPCCC Policy that accompanies the regulation changes. Major changes that were adopted with the BPCCC updates include: 

  • Suppliers have 1 calendar year to test assemblies not tested in previous calendar year (must still test at least 90% each year)
  • In specific situations, suppliers can self-issue extensions of the 120-day deadline for controlling discovered cross-connections (see section 4.11 of Policy 7) 
  • Assemblies and methods are now one combined compliance ratio (see new annual report template)
  • Cleaned up regulation to remove old dates and tables from delayed implementation schedules
  • Updated Policy 7 to include more detail on permitting cross connections, surveying, self issued extensions, and more

The Division is currently working on major updates to the Backflow Guidance Documents to incorporate the new BPCCC regulation and policy update. The guidance document updates and associated templates will be posted to the CDPHE WQCD BPCCC Website. Please stay tuned for updates! If you have any questions in the meantime, please email us at cdphe_wqcd_fss_questions@state.co.us.

➽ Heather Young, PE, CWP, Field Services Section Manager

➽ Clayton Moores, PE, Field Unit I Manager


Wednesday, November 22, 2023

Reporting Requirements: tampering and security breaches in your water system

In early 2022 the Water Quality Control Division published a Drinking Water Security Response Toolbox website designed to help water utilities plan for, prevent, and guide responses to security threats including threats of tampering, suspected tampering, general malevolent acts, cyberattacks, confirmed tampering, and violent acts. Physical security breaches and tampering events continue to pose a significant risk to Colorado’s public water systems and their ability to provide safe drinking water to their communities. The division would like to emphasize that it is critical for systems to: 

  1. Take measures to prevent security incidents.
  2. Plan their response to an attack.
  3. Know what constitutes a tampering event or a suspected tampering event.
  4. Understand the regulatory requirements for reporting tampering to the division. 

In response to recent tampering incidents and in an effort to clarify when it is required to report security events to the division, we have updated the Guidance: Report and Respond to Tampering Events or Security Threats. The guidance provides the following information for public water systems: 

  • Regulatory details and requirements for reporting tampering or suspected tampering events. 
  • Explanation of what constitutes an attempted, suspected, or confirmed tampering event.
  • Simple actions to help prevent tampering events.

For the purposes of this article, we will focus on the requirements for reporting tampering or suspected tampering and examples of what constitutes an attempted, suspected, or confirmed tampering event. 

Reg 11 requires PWS to report tampering (suspected or confirmed) to the division

Per Regulation 11.2(1), tampering events, suspected tampering, or receipt of a tampering threat must be reported to the Colorado Department of Public Health and Environment (department). The supplier must notify the department as soon as possible but no later than 10 a.m. of the next calendar day and notify the Department in writing no later than 5 days after any attempted, confirmed, or suspected tampering, or receipt of a tampering threat. Failure to report attempted, suspected, or confirmed tampering in a timely manner may result in a violation of Regulation 11. The guidance offers information on what information to submit. For ease of reporting, the department has created the Tampering Threat and Incident Report Form. If you have issues accessing the form please fill out the pdf version of the form and submit it to cdphe.wqacutes@state.co.us.

It is really important to emphasize that attempted or suspected tampering is reportable even if the event is not successful or confirmed. When in doubt, please contact the department. The role of the department during actual or suspected tampering events is to: 

  1. Help water system asses any possible impacts to water quality,
  2. Support the system experiencing the event(s) by connecting them with state and federal agencies that specialize in tampering and security issues in the water sector. 
  3. Support the industry and gather information to identify trends across the water sector. 

What constitutes an attempted, suspected, or confirmed tampering event?

What are some examples of tampering events?

  • Introducing a contaminant into a public water system or drinking water.
  • Interfering with drinking water or the operation of a public water system with the intent to harm people or the public water system infrastructure. 
  • Vandalism that physically damages storage tanks, fire hydrants, locks on well buildings, wellheads, intake structures, pump stations, treatment plants, backflow devices, or any other part of the physical infrastructure of the drinking water system. 
  • Any action that damages the integrity of a drinking water system or causes harm to the system including expending resources (staff’s time, funding to replace or repair damaged infrastructure, water loss, etc.).  
  • Unapproved removal of critical records, equipment, or chemicals. 

What are some previous tampering events that required reporting to the department?

  • Verbal threat of damaging the water system infrastructure. 
  • Malicious damage to fire hydrants in the distribution system. This can create a cross connection or cause pressure loss. 
  • Cybersecurity attack - ransomware attack that withheld SCADA system and billing system. 
  • Tank hatch alarm sounding to indicate the tank hatch is opening frequently with no system staff in the area.
  • Vandalism of security fencing and a well-house.
  • Purposefully attempting to drain the distribution system or storage tank, opening and closing valves without permission, intentional damage. 

What does not constitute a tampering event?

  • Any vandalism that poses no potential risk to public health, like non-destructive tagging which does not result in excessive costs to the system for removal/repair.
  • Accidental damage to the system such as a car accident that results in damage to a hydrant. 
  • Water theft is not considered tampering unless there is intent to damage or interfere with the system. Regardless of whether theft is tampering or not, please contact your local law enforcement. 

➽ Kyra Gregory Drinking Water Training Specialist  


Wednesday, November 15, 2023

Asset Management - the Key to a System's Capacity

The Water Quality Control Division’s Local Assistance Unit is charged with assisting Colorado’s public water systems with building their capacity to provide safe drinking water to their communities now and into the future. Capacity can be defined  as the amount that something can hold or produce, whether it is applied to people, things or systems. In a public water system (PWS), capacity is an indicator of the overall health of a system. A PWS’s capacity is assessed using 3 criteria: Technical, Managerial, and Financial or T-M-F. Just 3 little letters, sounds simple, right?  

Don’t let the  simplicity of those letters fool you, they are powerful. The key to a successful and healthy water system is T-M-F capacity. Every part of a water system can be classified under one (or more) of these criteria areas. So, it makes sense that understanding your system's capacity is essential to running a successful water system. In fact, when applying for funding an in depth capacity assessment may be required, depending on the funding source.  Beyond funding however, it is a tool that helps you manage and assess your system’s needs both short and long term.  

How can you determine your system's capacity?  

CDPHE’s TMF capacity worksheet tool can assist you. This worksheet offers a condensed, quick-tool version of the more robust TMF assessment done when applying for funding. By completing each question you will generate an estimate of your capacity percentage for each criteria area TM & F.  Using this percentage you can determine which areas are in good shape and which areas require more focus. Good TMF capacity is often tied to good asset management.  Understanding your system as a whole is critical to short- and long-term planning. Assets are everything your system is composed of from the physical infrastructure, pipes, meters, tubing, valves, etc. to the people that work in your system. Asset management is a cumulative inventory of your system as a whole that allows you to critically assess each piece, its lifetime, cost, and to generate a prioritized needs assessment. There are a variety of tools available for developing your asset management plan:

Need assistance with asset management or capacity development?

The Colorado Department of Public Health (CDPHE) Water Quality Control Division (WQCD) has capacity coaching available for free through the Local Assistance Unit (LAU). A PWS can request assistance by filling out the Coaching Assistance Form. Please welcome the newest member of our capacity development team Angela Green Garcia. Angela will be focusing on asset management and financial readiness.  

➽ Angela Green Garcia - Drinking Water Training Specialist






Wednesday, November 8, 2023

Lead and Copper Rule Revisions and Service Line Inventories

On August 14, 2023, the Water Quality Control Commission adopted the Lead and Copper Rule Revisions into Regulation 11. The changes to Regulation 11 are effective as of October 15, 2023, but the Lead and Copper Rule Revisions have a delayed start date and won’t take effect until October 16, 2024. The Lead and Copper Rule Revisions are a comprehensive update to the EPA’s 1991 Lead and Copper Rule.

Prior to adoption the division conducted an extensive stakeholder process with 26 meetings that provided opportunities for public feedback about the proposed changes. Overall, the division gained stakeholder consensus on adopting the Lead and Copper Rule Revisions into Regulation 11 within two years after promulgation of the revisions, and many of the stakeholder comments related to clarity of the rule requirements. The division reorganized the structure of the Lead and Copper Rule Revisions and incorporated stakeholder comments into the draft rule, where possible, to increase readability and clarity.

The Lead and Copper Rule Revisions affect more than 1,050 community and non-transient, non-community public water systems in Colorado, serving nearly 6.5 million people. A key requirement due by October 16, 2024 is that all systems subject to the rule must complete an initial lead service line inventory to classify the material of each service line entering a building, regardless of ownership.

To aid systems, the division has made many resources available to systems. First, we have posted EPA and state guidance for systems on how to complete a lead service inventory and reporting forms to submit to the division once completed. Second, the division contracted with Corona Engineering and worked with stakeholders to develop an initial lead service line inventory development policy that details the expectations for completion of an inventory and clarifies many lingering issues that remained unanswered in EPA guidance. Some examples include: 

  • When can galvanized pipe be considered non-lead versus galvanized requiring replacement?
  • How does a system use predictive modeling to complete their inventory?
  • When can a system indicate all service lines installed after 1959 are non-lead?

Third, we are contracting with WSP USA Inc to provide no-cost technical assistance to systems serving less than or equal to 15,000 people and allowing systems serving 7,500 or more people to apply for grants to assist with completing their service line inventory and service line replacement planning. This money cannot be used for physical replacement of lead service lines. Grants will be awarded on a first-come, first-serve basis to eligible applicants over several application periods. 

It’s important to note that with less than one year left to complete an initial lead service line inventory and recognizing the resources necessary to diligently complete an inventory, water systems may categorize service lines as “lead status unknown” when they cannot determine the material through an evidence-based approach. However, additional requirements, including customer outreach and planning, are triggered under the new rule if any service lines are listed as “lead status unknown.”

  • Other key changes under the LCRR include, but are not limited to:
  • Compliance with a new lead “trigger level” set at 10 parts per billion (ppb).
  • Tap sampling requirements that target lead service lines.
  • Testing water for lead in schools and childcare facilities.
  • Strengthened corrosion control treatment, lead service line replacement, and public education requirements.

Please note that these key requirements (e.g., lead trigger level and sampling changes) may be revised under another new rule, the Lead and Copper Rule Improvements (LCRI). The EPA plans to finalize the LCRI by October 2024. The department is awaiting more information about the LCRI in late 2023 or early 2024. Therefore, the department will provide communication and resources related to these requirements once more is known about the LCRI.

Resources:

➽ Bryan Pilson Technical & Regulatory Implementation & Coordination Unit Manager

Wednesday, October 25, 2023

Getting the lead out of drinking water - one fixture at a time

National Lead Poisoning Prevention Week is October 22-28, 2023

Certified Water Professionals across the state are our front line for promotion of the Culture of Health in drinking water. They work hard to protect water consumers at public water systems from all kinds of contaminants, from bacteria to uranium. One of the most complicated rules for protecting water consumers is the Lead and Copper Rule (LCR). Even when this rule is fully-implemented, it relies on careful sampling at a representative number of sample sites. No public water system is required to test at every point where consumers drink water to see if lead is present. 

But there is another program in Colorado that is doing just that. In 2022, the state legislature wanted to make sure that Colorado’s children were protected from lead in drinking and cooking water sources in the locations where they spend most of their time away from home: child care facilities and schools. The legislature passed House Bill 22-1358, implemented by the Water Quality Control Division as the Test & Fix Water for Kids program. This program, launched during the 2022-2023 school year, has conducted outreach to the nearly 6,000 licensed child care facilities and public or facility schools across the state serving children fifth grade and under. Each facility was asked to identify every water fixture used for drinking or cooking, and they were provided free test kits and analyses for lead. Over the past year, the program analyzed lead at over 53,000 fixtures across the state, representing about 600,000 children at 4,700 licensed facilities and schools. Ninety three percent (93%) of the samples collected were below the program action level of five parts per billion, and the remainder, about 3,700 fixtures total, are working through remediation funded by the program.

Why focus on fixtures?

In most cases, older brass fixtures are the cause of lead in water at schools and child care facilities. Older fixtures are not certified as lead free, and the materials in the fixture, when in contact with water, can leach lead. Replacing these fixtures can be a good solution. While lead service lines or copper pipe with lead solder can also be a source of lead, testing elevated locations with a follow up flush sample can help determine if premise plumbing is a cause. Almost none of the over 3,000 flush samples collected in this program showed elevated lead due to water contact with premise plumbing, and lead service lines were not commonly used for non-residential buildings. After repairs are made, each location is retested to confirm that lead is not present. The program is expanding to middle schools in the 2023-2024 school year.

How does this program affect compliance for public water systems with the LCR? 

The short answer is, it doesn’t! The results from this program are not reportable as part of the LCR and sampling conducted as part of this program do not “count” for sampling under the LCR. The good news is that when water systems do sample at these facilities, the Test & Fix Water for Kids program has already worked to get the lead out - one fixture at a time!

What can I do to protect myself and my family from lead in drinking water?

  • Before drinking, run the tap for 30 seconds.
  • Use only COLD water for drinking, cooking, and making baby formula. Boiling water does NOT remove lead.
  • Regularly clean the aerators on your faucets.
  • If you use a filter to remove lead, maintain it regularly.

➽ Margaret Talbott Infrastructure Unit Manager