Pages

Wednesday, January 31, 2024

New and Improved Template for Backflow Annual Reports

Recent changes to the backflow rule in order to maintain this critical public health protection aspect of the safe drinking water regulations, while making compliance easier to achieve has led to a new and improved backflow annual report template. The new report template titled Appendix D is available now on the department’s backflow website. The Appendix D template is recommended for all public water systems, including all community and non-community systems. Some highlights of the recent improvements include:

1. Uncontrolled Cross-connection Tracking: 

Water suppliers are required to track all uncontrolled cross-connections found during the calendar year. This tracking is important to ensure that all uncontrolled cross-connections are controlled within the required regulatory deadlines (120 days of discovery or an approved deadline extension). To assist with tracking this, uncontrolled cross-connections were divided into 3 sub-categories:

  • Question 7.A: Uncontrolled cross-connections that WERE controlled within regulatory deadlines
  • Question 7.B: Uncontrolled cross-connections that WERE NOT controlled within regulatory deadlines
  • Question 7.C: Uncontrolled cross-connections that REMAIN uncontrolled and are within regulatory deadlines
  • Question 7 Total: Sum of 7.A+7.B+7.C = 7 Total

For more information on uncontrolled cross-connections, see Section 4.1 of Drinking Water Policy 7.

2. Combined Compliance Ratio: 

The tracking of backflow assemblies and methods have now been combined into a single Backflow Prevention Annual Compliance Ratio for easier reporting. Questions 8, 9 and 10 in the improved annual report help suppliers calculate this compliance ratio as shown in the equation below.


3. Untested Assembly Tracking: 

All assemblies and methods must be tested or inspected every calendar year. If any assemblies or methods were missed one year, they need to be tracked to ensure they are prioritized the following year. If any assembly or method goes two calendar years without being tested or inspected then a violation has occurred and must be reported to the department. This replaces the old “90-day” rule as it was too challenging for suppliers to track and comply, with uncertain added health protection benefits. The new “2-year” rule gives suppliers time to get things tested and inspected. The department continues to guide systems to test/inspect annually and “catch up” with any missed tests or inspections as soon as possible in the next year.

Remember, backflow annual reports must be completed on or before May 1, 2024. Stay tuned for updated guidance related to supplier developed extensions, new templates for small systems (Appendix G & H), and the updated one-stop shop backflow guidance document coming soon. For any questions related to the backflow rule, please email the department’s backflow team at CDPHE_WQCD_FSS_Questions@state.co.us

Thank you.

➽ Clayton Moores, P.E., Backflow Team Lead 

Wednesday, January 17, 2024

Program Manager Message: Draft Lead and Copper Rule Improvements (LCRI) Considerations

In late 2023 EPA published its draft Lead and Copper Rule Improvements (LCRI). The intent of this update to the Lead and Copper Rule Revisions (LCRR) is, as the name implies, an effort to improve the nation’s approach to reducing lead exposure in drinking water. The LCRR was the first major update to the Lead and Copper Rule since its inception in the early 1990s. This effort is the first time EPA has tried to strengthen and improve a rule, before many of its compliance dates. This has complicated the approach to certain aspects of the LCRR, such as Lead Service Line Inventory (LSLI) efforts because the LCRI proposes to make some changes to the inventory requirements. The LCRI is currently in the draft stage, with comments due in early February. EPA is planning to finalize the rule in October 2024 and extend the compliance dates for most of the requirements that were initially placed in LCRR. This is not the case for the LSLI requirement, which is still due in October 2024. A bit confusing? Let’s take a look at some key elements, though as we all know, the details involved with lead and drinking water often need painstaking review and consideration. 

The LCRI proposed rule contains several key initiatives that EPA believes will improve upon the LCRR including: 

  • Enhanced requirements around Lead Service Line Inventories including more regular updates and adding lead service line connectors to the inventory, plus additional requirements to confirm non-lead status.
  • Full Lead Service Line Removal (LSLR) within ten years.
  • Modeling the tap sampling requirements after those that Michigan deployed a few years ago that involve using the highest lead result from 1st and 5th liter sample draws.
  • Lowering the lead action level from 15 parts per billion (ppb) to 10 ppb.
  • Requiring systems with multiple action level exceedance to enhance public outreach and make filters available to the public.

In addition, EPA took state’s implementation concerns with LCRR Specifically, EPA matched the lead testing in schools sampling procedure with its 3Ts Sampling Guidance that schools routinely use. There were also some changes to the “Find and Fix” provisions, which are being renamed and as well as changes to the small system flexibility options.

As with any new rule proposal challenges also lie within the details, and some of the items we are concerned about include:

  • Adding connectors into the inventory requirements at this relatively late stage when many systems have already started or completed inventory efforts.
  • Requiring pipe loop studies to evaluate corrosion control in more circumstances than necessary, as these studies are difficult, time consuming and expensive to conduct and may not yield better study results.
  • Not fully allowing for an alternative approach to Optimum Corrosion Control Treatment (OCCT) similar to the variance that Denver Water received in 2019.

The bottom line is that this rule will still be more challenging than the current lead and copper rule for water systems to comply with and states to oversee. There is a significant need for guidance and training on this rule and its many new requirements. States also need database capabilities to manage all the information and compliance data that will be needed to support implementing this rule.

EPA also estimates that LCRI will involve 38 new reviews by states, the need to develop and utilize at least eight new templates and five new system-state consultations. LCRI will require significant new resources to implement. Colorado implemented several new rules the last decade involving disinfection, water haulers, storage tanks, backflow prevention and cross connection control, and the revised total coliform rule without adding program resources for implementation. However, with LCRI coming in the same year as the new PFAS rule and Consumer Confidence Rule (CCR) revisions, the division must obtain additional resources to support maintaining primacy into the future.  

As always, we will be engaging stakeholders in developing the LCRI rule for Colorado. Fortunately, we learned a lot from moving forward with adopting LCRR and can bring that knowledge to bear on the LCRI rulemaking process. We will work to identify assistance, policy and training needs and strive to help water systems meet the LCRI requirements as best we can considering our funding and resource levels. I suggest that water systems learn about the new draft LCRI rule and take steps to prepare your water system for it. Specifically, will your system be impacted by the changed sampling requirements and lower lead action level? How will your system respond to the requirements involving any test result above the action level? Getting in front of this now is the best approach to keeping tap water safe for your customers. 

Thank you.

➽ Ron Falco, P.E. Safe Drinking Water Program Manager

Wednesday, January 10, 2024

A friendly reminder of a valuable resource! - CCWP Operator Certificate Search

Colorado Certified Water Professionals (CCWP) provides an easy way to verify an operator’s certification status. On CCWP’s public search page, you simply enter an operator’s name, the operator’s ID number, or a certificate number and click the search button. The search should return an operator’s ID number, name, certificate number, certificate type and class, the expiration date of the certificate, and the status of the certificate. If no information is returned, you should contact the CCWP Office for confirmation of your search results.

This feature is not just helpful to certified operators. Facility owners should also be verifying the status of certified operators in the CCWP Portal to ensure they’re not putting an unqualified person in charge of their facility. Doing so could have disastrous consequences for public health and the integrity of the facility. The public search page is the only valid way to verify the status of an individual’s certification and is a quick and easy way of doing so. 

For questions on how to use the CCWP Portal certified operator search feature, feel free to contact Jessica Morgan (cdphe.facilityoperator@state.co.us) or CCWP (info@coloradocwp.com). 

➽ Jessica Morgan, Facility and Operator Outreach and Certification Board Liaison


Wednesday, December 27, 2023

Risk and Resilience Assessments and Emergency Response Plans

While attending the annual conference of the Association of State Drinking Water Administrators (ASDWA), an organization consisting of my counterparts across the U.S. and including territories, presentations were given about drinking water emergencies that generated national attention. These included the train derailment in East Palestine, Ohio and boil water orders in Jackson, Mississippi. At a previous conference I gave a talk about the Marshall Wildfires. I am sure most of us are aware of the tragic Lahaina, Hawaii wildfire that struck Maui earlier this year.

Extreme events like these are exceedingly difficult to consider and plan/prepare for. But there are requirements in the Safe Drinking Water Act (SDWA) for utilities to assess their vulnerability and risks, and to develop emergency response plans. These requirements came in with America’s Water Infrastructure Act (AWIA) that was signed into law in October 2018. AWIA Section 2013 specifies that all Community Water Systems with populations greater than 3,300 must conduct Risk and Resilience Assessment (RRAs) and Emergency Response Plans (ERPs). These documents need to be reviewed and updated at least every five years. Since this provision of SDWA is directly implemented by EPA, water systems must certify directly to EPA every five years that they have completed these required activities. The initial RRA certifications were due to EPA from March 2020 to June 2021 depending on systems size, so the first five-year updates are due from March 2025 to June 2026. For more information about upcoming review deadlines and requirements please visit the EPA’s RRA/ERP website. The ERP is intended to be developed in a way that addresses system-specific elements based on its RRA, so these certifications are due six months after the RRA certifications.

The RRA needs to address the following components:

  • Risks from malevolent acts and natural hazards
  • Traditional water system infrastructure resilience including electronic, computer, or other automated systems (including the security of such systems) utilized by the system
  • Financial infrastructure
  • System monitoring, operations and maintenance
  • Chemical use, storage and handling

Note that item two above essentially includes cybersecurity. EPA has a Vulnerability Self-Assessment Tool (VSAT) to help water systems complete their RRA. The Cybersecurity and Infrastructure Security Agency (CISA) and the Colorado Information Analysis Center (CIAC)also provide numerous tools to help systems address the cyber components of the RRA.

After completing the RRA, the ERP needs to be developed and describe strategies, resources, plans and procedures utilities will use to prepare for and respond to emergency incidents. The incidents can be natural or human-caused and range from line breaks to major disasters like floods or wildfires. The ERP needs to specifically address:

  • Strategies and resources to improve resilience including physical security and cybersecurity.
  • Emergency response strategies and resources
  • Proactive approaches to lessen the impact of emergency incidents
  • Strategies to help detect malevolent acts or natural hazards that could harm the system

Water systems should coordinate with local emergency planning agencies and must retain copies of their RRA and ERP.

This SDWA provision is not part of state primacy, but is overseen by EPA. To date, EPA has primarily overseen compliance with these requirements via ensuring that systems have submitted their certification. However, going forward EPA is conducting inspections at water systems across the U.S. and soon in Colorado to evaluate compliance with these requirements and help systems become better prepared to prevent emergencies, lessen their severity and respond.

We all know that emergency preparedness is the right thing to do, but it can be hard to prioritize in the face of day-to-day tasks and seeming crises. However, recent events like the emergencies at water systems that have gained national attention and cyberattacks that have involved ransomware and attempts to access control systems should raise our awareness of the value of these efforts. Maybe this information can help you gain support in your utility to keep up with risk assessment and emergency planning activities, especially with respect to cybersecurity. It’s clear that assessing cybersecurity risks and planning to address those risks is part of SDWA, even though EPA’s early 2023 memorandum about cybersecurity and sanitary surveys was rescinded. 

Cybersecurity threats appear to be ever-changing and more threatening. Our Drinking Water Security Response Toolbox is designed to help you meet these AWIA requirements and keep your water systems safe and protected. 

Thank you.

➽ Ron Falco, P.E. Safe Drinking Water Program Manager


Wednesday, December 20, 2023

Wellhead Deficiencies

In this article, we continue our discussion of the Top 10 most frequently cited significant deficiencies and violations to raise awareness and help operators identify and correct issues before they become a potential health threat or citations in a sanitary survey. At #2 in the Top 10, source construction deficiencies (S030) were cited 9% of the time during sanitary surveys for the 2022 inspection year and 9% in the 2023 inspection year. Groundwater wells are the most common sources of drinking water used in Colorado (70% of public water systems use groundwater wells) and are perhaps one of the most overlooked parts of water systems. Wells can go unnoticed for years since they are often located away from most activities and may only be noticed when the flow of water is altered. The most commonly discovered significant deficiencies with wells are related to electrical conduits, gaskets, vents and vaults.

What are the minimum standards for a properly constructed well? In the “State of Colorado Design Criteria for Potable Water Systems” (Policy DW005), CDPHE actually primarily refers to the Colorado Division of Water Resources’ (DNR) latest edition of “2 CCR 402-2 Rules and Regulations for Water Well Construction, Pump Installation, Cistern Installation, and Monitoring and Observation Hole/Well Construction” (a.k.a. Colorado Well Driller Regulations). The purpose of these regulations is to ensure public health and the safety of groundwater resources. The regulation outlines minimum construction standards for all types of wells in all types of environments, and it defines minimum well height, screening, minimum distance from potential sources of contamination, grouting standards, pump installation and much more.

There are many variations to well heads, but the two primary ones that inspectors come across are the “split-cap” and the “well-cap” (see image below for reference). The “split-cap” has the discharge line, vent and electrical conduit all protruding from the wellhead. The well head is comprised of two metal plates with a rubber gasket in between. When installed, the two plates are compressed, the rubber gasket expands and creates a watertight seal. The “well-cap” has a pitless water connection (below frostline) and a designated female electrical connection, a set of gaskets and a built-in vent (which are typically screened).


*photo courtesy of Oregon State University https://wellwater.oregonstate.edu/well-water/wells/well-check-list

Well head

Well heads must be designed and constructed at the top of well casings to prevent the entry of contaminants into the well. The majority of the wells that the department inspects are located outdoors and are exposed to the elements. It is vital that the wells are constructed and maintained in a manner that will protect the raw water. Some common issues that inspectors observe are missing/damaged gaskets, missing bolts, broken or loose well caps (bolts are missing or not tightened), split-caps not seated on the well casing properly and a split-cap with a rope (used to hold the well pump in position or to assist in pulling the pump out) coming out of the well that is not properly sealed.

The split-cap well head was not properly sealed to the well casing. The supplier applied caulking between the split-cap and the well casing.

The bottom of the well head cap was broken and did not allow for a tight seal. A new well head was installed.

Well Vents

Vents are an integral part of a well as they permit air to freely enter and exit the well. Vents need to be located at a minimum of one foot above ground level, be turned down and be covered with a non-corrodible screen. Screens may not have openings that exceed 0.07 inches (typically 12 or 16 mesh screen). 

The two most common issues observed with vents on wells are that they are broken or missing.


The well-cap has a built-in vent that was broken/corroded. The supplier replaced the broken screen with an acceptable mesh screen.

Electrical Conduit

According to the Colorado Well Driller Regulation, electrical connections are to meet the standards of the NFPA 70: National Electric Code (2014). Some common electrical conduit issues that are observed during sanitary surveys are where the electrical conduit has separated from the well head or the junction box which can typically occur due to the ground settling. Another common finding is missing or partially attached cover plates on electrical junction boxes. Split-cap wells can also have electrical wires penetrating the well top without a properly constructed conduit or a proper seal between the wire and the rubber gasket. All of these situations present a pathway for contaminants to enter the well, which pose a health risk and are significant deficiencies that will be cited during a sanitary survey.


The electrical conduit separated from the electrical junction box, creating an opening. The supplier installed a conduit sleeve to provide a watertight junction.


The electrical junction box was missing a screw. The supplier sealed the hole with caulk.


Split-cap well had the electrical wire enter from an unsealed port. The supplier sealed the gap with caulk.

Well Vaults

Although well vaults are not a common practice these days, the department still observes wells located in vaults. Placing a well in a vault was a common practice to protect the well from the elements. However, having a well in a vault can subject the well to flooding. If a well is located in a vault, the vault cover or lid must be watertight and the vault must either drain to daylight or have a sump. Evidence of water accumulating in the vault and potentially submerging the wellhead is a significant deficiency.


Well vault was subject to flooding. Supplier installed a sump pump.

Concrete Pads

Inspectors are frequently asked if concrete pads are required? The Colorado Well Driller Regulation along with the department do not recommend that wells have concrete pads with the exception of hand-pumped wells. Well pads were commonly installed if well depths were less than 100 feet or to keep vegetation down around the well head. However, the department has observed that concrete pads tend to attract animals that burrow underneath the pad creating a source of contamination. Concrete pads also tend to crack and shift, which can create a funnel effect and divert surface water to the well casing. Minor cracks can be repaired; however, the department recommends that a supplier remove their existing concrete pad if they notice animals burrowing or if the concrete pad begins to divert surface water to the well casing. Evidence of burrows under a concrete pad or severely damaged pads capable of channeling surface water to the well casing are significant deficiencies that would be cited during a sanitary survey.


Burrow located under the concrete pad, the burrow was filled in and will be monitored in the future.

Drainage and Slope

According to the Colorado Well Driller Regulation, well locations should incorporate proper positive drainage from the well casing. As a rule of thumb, the department has historically viewed positive drainage 20 feet in all directions from the well if possible. Wells should not be located in depressions as surface water can pool around the well casing and be a source of contamination. If a well is built on a slope, a berm is recommended uphill to divert runoff and surface water away from the well casing. 


Well was located in a depression that could allow for water to pool around the well casing. The supplier added pea gravel around the well head and created positive drainage away from the well casing.

For more information the department recommends that suppliers utilize DNR’s latest edition of “2 CCR 402-2 Rules and Regulations for Water Well Construction, Pump Installation, Cistern Installation, and Monitoring and Observation Hole/Well Construction” for proper well construction, maintenances and fixes. In addition, suppliers may email the Field Services team at cdphe_wqcd_fss_questions@state.co.us if they have any questions or concerns.

➽ Tom Valenta, CWP, Field Services Work Group Leader

Wednesday, December 13, 2023

Cybersecurity: simple steps to protect your system

Cyberattacks on critical infrastructure in the US continue to be a major concern and present a potential disruption to the critical work that water and wastewater systems provide for their communities. On October 12, 2023 the US EPA withdrew their Cybersecurity Rule citing legal challenges. However, cybersecurity planning and preventing attacks continues to be a central focus of the federal government. EPA and CISA continue to provide technical support to water systems. Regardless of federal requirements, the division wants to emphasize the significant financial and operational risks that cyberattacks pose to systems. The division continues to partner with state and federal entities to provide cybersecurity planning tools, resources, training opportunities, and self-evaluations.

Who is vulnerable?

According to a recent Waterfall Security Report, in 2022 the critical infrastructure sector experienced a 140% surge in cyberattacks resulting in more than 150 incidents. The majority of these assaults were in the form of ransomware, encrypting critical computer systems and invaluable data across Informational Technology (IT) networks. However, the attacks impacted operational technology (OT) as well. Any system that uses OT and or IT is vulnerable to cyberattacks. These attacks can negatively affect treatment, distribution, collections, administrative support, and financial/billing systems. These effects can impact your ability to protect public health and the environment and often cost large sums of money. Here are some examples of OT and IT:

  • OT = Industrial Control System (ICS), Supervisory Control and Data Acquisition (SCADA), Programmable Logic Controllers (PLCs),Remote terminal units (RTUs), Internet of things (IoT) devices, Industrial internet of things (IIoT) devices, also known as Industry 4.0, building management systems, fire control systems, and physical access control mechanisms.
  • IT = Laptops, Desktops, Tablets, servers, computer hardware, software, electronics, semiconductors, internet, telecom equipment, and e-commerce.

What are some basic steps you can take to protect your system?

Regardless of the size of your system or the scope of your technology use. please take the following basic cybersecurity steps at your facility to help prevent cyberattacks: 

  1. Change passwords regularly (at least once every 3 months). 
  2. Use multi-factor authentication for access.
  3. Take away system access when staff leave the utility.
  4. Implement regular staff training on cybersecurity fundamentals (especially how to recognize phishing attempts).
  5. System maintenance
    • Do frequent back-ups
    • Keep up to date with software and install patches

According to EPA and CISA, taking these low-cost steps can prevent many cyberattacks.

In addition to the above basic preventive measures you and your system can explore the many available free cybersecurity tools and resources: 

Thank you for all that you and your system do to protect the public health and environment of Colorado’s communities! Please reach out to the division’s security contact kyra.gregory@state.co.us with any questions. 

➽ Heather Young Field Services Section Manager 

➽ Kyra Gregory Drinking Water Training Specialist 


Wednesday, December 6, 2023

Backflow Prevention and Cross Connection Control Regulation Updates


The updated Backflow Prevention and Cross Connection Control Program (BPCCC) rule (in Regulation 11 Section 11.39) was officially active as of October 15, 2023! The Division greatly appreciated all the stakeholder support in developing the updated BPCCC regulation and also the updated DW007 BPCCC Policy that accompanies the regulation changes. Major changes that were adopted with the BPCCC updates include: 

  • Suppliers have 1 calendar year to test assemblies not tested in previous calendar year (must still test at least 90% each year)
  • In specific situations, suppliers can self-issue extensions of the 120-day deadline for controlling discovered cross-connections (see section 4.11 of Policy 7
  • Assemblies and methods are now one combined compliance ratio (see new annual report template)
  • Cleaned up regulation to remove old dates and tables from delayed implementation schedules
  • Updated Policy 7 to include more detail on permitting cross connections, surveying, self issued extensions, and more

The Division is currently working on major updates to the Backflow Guidance Documents to incorporate the new BPCCC regulation and policy update. The guidance document updates and associated templates will be posted to the CDPHE WQCD BPCCC Website. Please stay tuned for updates! If you have any questions in the meantime, please email us at cdphe_wqcd_fss_questions@state.co.us.

➽ Heather Young, PE, CWP, Field Services Section Manager

➽ Clayton Moores, PE, Field Unit I Manager